There may be instances where conditions at the site change and additional costs to the project are warranted. However, the need for change orders can often be mitigated early in the build cycle. Conducting a thorough site survey (aka site walk) and documenting the site survey findings is an effective measure for avoiding cost overruns.
Download the whitepaper to read which critical components should be included to help ensure an effective site survey and avoid unnecessary change order costs.
Avoiding Costly Change Orders in an In-Building Wireless Implementation
Contact
IBW Advisors
1645 E Missouri Avenue
Suite 420
Phoenix, AZ 85016
602-418-7880